District Right-of-Way Construction Standards
Standard Specifications
Provided herein are standard specifications and guidelines which the District has either developed or adopted. The guidelines contain criteria and standards which govern engineering and rights-of-way practices at the District. The figures show standard drawing details for commonly used equipment and materials at the District. The specifications provide more detailed information to staff, consultants and contractors who will be performing services on behalf of the District. Where not specifically referenced herein, Utah’s American Public Works Association (APWA) standard specifications and/or American Water Works Association (AWWA) standards apply.
The APWA standard specifications are found at the following location: utah.apwa.net
Division 1 - General Requirements
Section 01 31 13: Coordination
Section 01 35 10: Pipe Loading Restrictions
Division 2 - Existing Conditions
Section 02 10 00: Storage, Contamination & Drainage
Section 02 10 05: Damage & Unanticipated Conditions
Division 3 - Concrete
Division 31 - Earthwork
Section 31 23 16: Excavation
Division 32 - Exterior Improvements
Section 32 15 50: Gravel Roadways or Driveways
Section 32 31 10: Fences and Gates - General
Section 32 31 13: Chain Link Fences and Gates
Section 32 31 15: Wood Fences and Gates
Section 32 31 16: Welded Wire Fences and Gates
Section 32 31 17: Composite Fences and Gates
Section 32 31 18: Split Rail Fences and Gates
Section 32 91 20: Landscaping
Section 32 92 19: Seeding, Weed Control & Erosion Control
Division 33 - Utilities
Section 33 02 00: Utility Crossings
Section 33 05 01: Acrylonitrile-Butadiene-Styrene ABS Pipe (see APWA)
Section 33 05 02: Concrete Pipe and Culvert (see APWA)
Section 33 05 05: Ductile Iron Pipe (see APWA)
Section 33 05 06: Polyethylene Pipe (see APWA)
Section 33 05 07: Polyvinyl Chloride Pipe (see APWA)
Section 33 05 09: Steel Pipe